J 0226_J 0225_6302022_023329.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR CORRODED MISSING
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE
8 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: NO - MISSING CIRCUM REBAR
165.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
228.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - ROCK
241.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
362 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 71 | SRC | CIRCUM REBAR CORRODED MISSING |
| 228.2 | DSZ | ROCK |
| 0 | MWM | — |
| 420.2 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 420.9 | AMH | 3:30AM |
| 420.1 | DSZ | SLUDGE ROCKS |
| 8 | SRC | MISSING CIRCUM REBAR |
| 13.8 | DSZ | SLUDGE ROCKS |
| 2 | DAGS | — |
| 2 | SRC | CIRCUM REBAR CORRODED MISSING |
| 131.6 | SSS | BLISTERING CONCRETE |
| 0 | MWL | — |
| 420.1 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAM | SEVERE AGG |
| 362 | SSS | PEELING CONCRETE |
| 241.1 | SAV | SEVERE AGG SPORATIC |
| 165.1 | SSS | BLISTERING PEELING CONCRETE |
| 0 | AMH | 2:30AM |
| 420.1 | SAV | SEVERE AGG |
| 420.2 | MGO | Conn. @ Mh, 3 O' Clock. Capped |
| 2 | SSS | BLISTERING CONCRETE |
| 420.1 | DAGS | — |
| 223.9 | SAM | SEVERE AGG |