Wastewater/Activity/PacpInspection/1.0Jul 5, 2022, 08:18 AM
B 1274_B 1273_752022_020512.mp4
Date
07/05/2022
W/O
0957304
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01126
PipeID
P25169
Time
1:18 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
—
Pre-Cleaning
Not Known
Media Label
H3140
Sewer Name
B JOINT OUTFALL B - UNIT 6J
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20220705MDM_JOINT_OUTFALL_B_UNIT_6J
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
B 1274
Downstream MH
B 1273
Dir. of Survey
Downstream
Length Surveyed
169.5 ft.
Total Length
169.5 ft.
Structural Index
3
Structural Quick
4221
Structural Rating
10
O&M Index
2
O&M Quick
3122
O&M Rating
8
Overall Index
3
Overall Quick
—
Overall Rating
18
Pipe schematic from manhole B 1274 to B 1273
Observation photos (4)
1 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - ROCKS INSIDE MH AND DOWNSTREAM
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
106.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG