Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2022, 08:44 AM
  • 08 0660_08 0659_6222022_024626.mp4

Date
06/22/2022
W/O
0961670
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00446
PipeID
P24623
Time
1:44 AM
Certificate
U-1014-0602253
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3131
Sewer Name
08 FIGUEROA STREET RELIEF TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
20220622MDM_FIGUEROA_STREET_RELIEF_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Upstream MH
08 0660
Downstream MH
08 0659
Dir. of Survey
Downstream
Length Surveyed
73.9 ft.
Total Length
73.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3122
O&M Rating
7
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 08 0660 to 08 0659
MH: 08 0660MH: 08 0659downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 2:55AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - GREASE COAT ON 100% OF PIPE2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE2 ft. MGP - General Photograph - GREASE COAT ON PIPE24.3 ft. MGO - General Observation - 100% GREASE COAT29.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE29.8 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - SLUDGE31.8 ft. MGO - General Observation - VCP UNDER GREASE COAT49.5 ft. MGO - General Observation - ZOOM 24'49.5 ft. MGO - General Observation - 15% SLUDGE STOPPED CAMER73.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish - 100% GREASE COAT ON PIPE73.5 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE73.9 ft. AMH - Downstream Manhole, Survey Ends - 3:25AM

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - GREASE COAT ON 100% OF PIPE

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - GREASE COAT ON 100% OF PIPE

  • General Photograph - GREASE COAT ON PIPE

    2 ft. - General Photograph - GREASE COAT ON PIPE

  • General Observation - 100% GREASE COAT

    24.3 ft. - General Observation - 100% GREASE COAT

  • General Observation - ZOOM 24'

    49.5 ft. - General Observation - ZOOM 24'

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Finish - 100% GREASE COAT ON PIPE

    73.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish - 100% GREASE COAT ON PIPE

Observations (17)

DistanceCodeObservation
29.8DSZSLUDGE
29.8DSZSLUDGE
2DAGSGREASE COAT ON 100% OF PIPE
31.8MGOVCP UNDER GREASE COAT
0MWL
73.9AMH3:25AM
24.3MGO100% GREASE COAT
49.5MGOZOOM 24'
73.5DAGS100% GREASE COAT ON PIPE
49.5MGO15% SLUDGE STOPPED CAMER
0MGOConn. @ Mh, 3 O' Clock. OPEN
0AMH2:55AM
73.5DSZSLUDGE
0MGOConn. @ Mh, 9 O' Clock. Active
0MWM
2DSZSLUDGE
2MGPGREASE COAT ON PIPE

Properties (7)

custom_field_three
100% GREASE COAT ON PIPE-POSSIBLE 4
custom_field_two
5
customer
LACSD
datetime
2022-06-22T01:44:17-07:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false
year_laid
20020802