Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2022, 09:45 AM
  • 15 0453_15 0452_03292022_025618.mp4

Date
03/29/2022
W/O
946907
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00621
PipeID
P12378
Time
2:45 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10024
Sewer Name
15 POTRERO AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_946907_TV15194_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0453
Downstream MH
15 0452
Dir. of Survey
Downstream
Length Surveyed
254.1 ft.
Total Length
254.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
250
O&M Index
2
O&M Quick
2I00
O&M Rating
100
Overall Index
2
Overall Quick
Overall Rating
350
Pipe schematic from manhole 15 0453 to 15 0452
MH: 15 0453MH: 15 0452downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 04530 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 40%MAG COAT2.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"42.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"78.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN91.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN145.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN154.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN205.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN215 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN252.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish252.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish252.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE254.1 ft. MGO - General Observation - ROACHES @ MH254.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0452

Observation photos (6)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - 40%MAG COAT

    2 ft. - General Observation - 40%MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    254.1 ft. - General Observation - ROACHES @ MH

Observations (22)

DistanceCodeObservation
2.8SSS
154.5TFOPEN
2DAGS
254.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
215TFOPEN
42.4TFC
2.8SAP
145.7TFOPEN
9.3TFA
2MGO40%MAG COAT
0MWL
91.5TFOPEN
252.1SAP
205.6TFOPEN
0AMH15 0453
78.9TFOPEN
252.1DAGS
252.1SSS
0MGOROACHES @ MH
254.1MGOROACHES @ MH
254.1AMH15 0452
0MWM

Properties (7)

additional_info
630138032822203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-29T02:45:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false