Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2022, 09:56 AM
  • 15 0452_15 0451_03292022_030956.mp4

Date
03/29/2022
W/O
946907
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00621
PipeID
P12377
Time
2:56 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10024
Sewer Name
15 POTRERO AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_946907_TV15194_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0452
Downstream MH
15 0451
Dir. of Survey
Downstream
Length Surveyed
327.6 ft.
Total Length
327.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole 15 0452 to 15 0451
MH: 15 0452MH: 15 0451downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 15 04520 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - 40% MAG COAT98 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN110.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN143 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"146.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"164.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN227.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN249.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN264 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN303.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"325.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish325.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish325.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.6 ft. AMH - Downstream Manhole, Survey Ends - 15 0451

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 40% MAG COAT

    2.5 ft. - General Observation - 40% MAG COAT

Observations (22)

DistanceCodeObservation
264TFOPEN
325.4DAGS
325.4SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
327.6AMH15 0451
98TFOPEN
249.2TFOPEN
2.5SAP
110.2TFOPEN
2DAGS
227.8TFOPEN
2SSS
2.5MGO40% MAG COAT
0AMH15 0452
325.4SAP
303.1TFA
143TFC
0MGOROACHES @ MH
0MWL
146.1TFA
164.4TFOPEN
0MWM

Properties (7)

additional_info
630138032822203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-29T02:56:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false