Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 18, 2022, 09:25 AM
  • 08 0535_08 0534_05182022_033744.mp4

Date
05/18/2022
W/O
952096
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00021
PipeID
P00597
Time
2:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10116
Sewer Name
08 VICTORIA STREET TRUNK
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
RFIR_WO_952096_TV08031_MAY2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
08 0535
Downstream MH
08 0534
Dir. of Survey
Downstream
Length Surveyed
243 ft.
Total Length
243 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
141
O&M Index
2
O&M Quick
2I00
O&M Rating
96
Overall Index
2
Overall Quick
Overall Rating
237
Pipe schematic from manhole 08 0535 to 08 0534
MH: 08 0535MH: 08 0534downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 05350 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start241.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish241.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish243 ft. AMH - Downstream Manhole, Survey Ends - 08 0534

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
241.2DAGS
0AMH08 0535
0MWM
0MWL
243AMH08 0534
2DAGS
241.2CM
5.9CM

Properties (7)

additional_info
630063051722204
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-05-18T02:25:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false