Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 11:07 AM
  • 22 0609_22 0608_05062022_051621.mp4

Date
05/06/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16956
Time
4:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10050
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0608
Downstream MH
22 0609
Dir. of Survey
Upstream
Length Surveyed
147.4 ft.
Total Length
147.4 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
145
Pipe schematic from manhole 22 0608 to 22 0609
MH: 22 0608MH: 22 0609upstream0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE. REMAINDER COMPLETED FROM U/S MH.0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish10 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"26.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"66.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"90.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"97.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start145.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start147.4 ft. MWM - Water Mark, 40 %of cross sectional area147.4 ft. MGO - General Observation - COCKROACHES AT MH147.4 ft. MWL - Water Level, 40 %of cross sectional area147.4 ft. AMH - Downstream Manhole, Survey Begins - 22 0608

Observation photos (3)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
56.6TFA
0MWM
147.4SAP
50.2TBA
0MGOCOCKROACHES AT MH
0MWL
2SSS
121.1TFA
0AMH22 0608
81.1TBA
2SAP
147.4MSAREVERSAL COMPLETE. REMAINDER COMPLETED FROM U/S MH.
137.4TFA
147.4SSS

Properties (7)

additional_info
630063050522203
custom_field_three
SPALLING/PROJECTING AGGREGATE/DEBRIS
custom_field_two
2
customer
1
datetime
2022-05-06T04:07:23-07:00
documentation
PRO PIPE
is_lateral_inspection
false