Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 10:39 AM
  • 22 0608_22 1444_05062022_050343.mp4

Date
05/06/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P21166
Time
3:39 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10050
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0608
Downstream MH
22 1444
Dir. of Survey
Downstream
Length Surveyed
340.8 ft.
Total Length
340.8 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
464
Pipe schematic from manhole 22 0608 to 22 1444
MH: 22 0608MH: 22 1444downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06080 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.5 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"8.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"10.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"28.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"43.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"91.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"111.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.3 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"148 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"200.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"221.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"273.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"298.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"312.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish312.7 ft. MMC - Material Change, Vitrified clay pipe320.7 ft. MMC - Material Change, Concrete pipe (non-reinfored)320.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start320.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start339.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish339.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish339.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340.8 ft. MGO - General Observation - COCKROACHES AT MH340.8 ft. AMH - Downstream Manhole, Survey Ends - 22 1444340.8 ft. MGO - General Observation - STOP LOG CONNECTION AT MH 12 O'CLOCK

Observation photos (8)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    312.7 ft. - Material Change, Vitrified clay pipe

  • Material Change, Concrete pipe (non-reinfored)

    320.7 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    320.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    320.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES AT MH

    340.8 ft. - General Observation - COCKROACHES AT MH

Observations (36)

DistanceCodeObservation
221.3TFA
312.7SSS
339.1DAGS
8.4TBA
339.1SSS
340.8MGOCOCKROACHES AT MH
28.3TFA
148TFC
2SSS
176.6TFC
2SAP
273.6TFC
2DAGS
137.3TBA
43.3TFA
298.1TFC
312.7SAP
320.8SSS
111.5TBA
113.8TBA
200.8TFC
320.7MMC
253.7TB
312.7MMC
339.1SAP
340.8AMH22 1444
340.8MGOSTOP LOG CONNECTION AT MH 12 O'CLOCK
0AMH22 0608
91.6TFA
320.8SAP
87.5TFC
0MWM
10.4TBA
7.5TBA
243.1TBA
0MWL

Properties (7)

additional_info
630063050522203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-06T03:39:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false