Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2022, 08:28 AM
  • 22 0618_22 0617_04262022_023914.mp4

Date
04/26/2022
W/O
951828
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00827
PipeID
P16966
Time
1:28 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10080
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0618
Downstream MH
22 0617
Dir. of Survey
Downstream
Length Surveyed
213.1 ft.
Total Length
213.1 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
126
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
128
Pipe schematic from manhole 22 0618 to 22 0617
MH: 22 0618MH: 22 0617downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06180 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.7 ft. MGO - General Observation - MAG COAT2.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"34.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"86.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.8 ft. TSI - Tap Saddle Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"135.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"183.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"192 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish213.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0617

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Saddle Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

    90.8 ft. - Tap Saddle Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 1"

Observations (17)

DistanceCodeObservation
90.8TSI
200TF
213.1AMH22 0617
211.5SAV
0MWL
0MWM
183.8TF
86.7TFC
192TFC
0AMH22 0618
135.2TFC
21.8TFC
34.5TF
2.7MGOMAG COAT
2.7SAV
0MGOCONNECTION AT THE MH 9 OC'LOCK
183.7TF

Properties (7)

additional_info
630074042522201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-04-26T01:28:06-07:00
documentation
PROPIPE
is_lateral_inspection
false