Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2022, 07:03 AM
  • 22 0636_22 0635_04222022_011517.mp4

Date
04/22/2022
W/O
951828
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00827
PipeID
P16984
Time
12:03 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10078
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0636
Downstream MH
22 0635
Dir. of Survey
Downstream
Length Surveyed
277.4 ft.
Total Length
277.4 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
165
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
165
Pipe schematic from manhole 22 0636 to 22 0635
MH: 22 0636MH: 22 0635downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06360 ft. MWM - Water Mark, 20 %of cross sectional area2.3 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COATING10.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"34.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"59.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"109.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"164 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"170.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"212.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"275.8 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish277.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK277.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0635

Observation photos (1)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
109.5TFC
10.9TFC
2.3SAV
212.6TFC
34.7TF
0MWL
277.4MGOCONNECTION AT MH 9 O'CLOCK
2.3MGOMAG COATING
275.8SAV
277.4AMH22 0635
133.7TFC
85.6TF
164TFC
0AMH22 0636
170.4TF
0MWM
59.1TFC

Properties (7)

additional_info
630098042122201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-04-22T00:03:38-07:00
documentation
PROPIPE
is_lateral_inspection
false