Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2022, 08:39 AM
  • 22 0615_22 0614_05052022_030000.mp4

Date
05/05/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16962
Time
1:39 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10047
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0614
Downstream MH
22 0615
Dir. of Survey
Upstream
Length Surveyed
112.8 ft.
Total Length
112.8 ft.
Structural Index
3
Structural Quick
3C2C
Structural Rating
110
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
110
Pipe schematic from manhole 22 0614 to 22 0615
MH: 22 0614MH: 22 0615upstream0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE.0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish6.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"39.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"39.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"110.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start110.8 ft. MGO - General Observation - MAG COAT110.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start112.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0614112.8 ft. MWL - Water Level, 50 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
12.2TFA
0AMH22 0614
73.5TBA
2SAP
106.1TFC
2MGOMAG COAT
32.6TFA
112.8SSS
112.8MSAREVERSAL COMPLETE.
2SSS
112.8SAP
0MWL
73.5TFC

Properties (7)

additional_info
630063050422201
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-05-05T01:39:02-07:00
documentation
PROPIPE
is_lateral_inspection
false