Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 08:18 AM
  • 22 0686_22 0685A_05062022_022658.mp4

Date
05/06/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P21326
Time
1:18 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10050
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
15
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0686
Downstream MH
22 0685A
Dir. of Survey
Downstream
Length Surveyed
69.9 ft.
Total Length
69.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
2
Overall Quick
Overall Rating
25
Pipe schematic from manhole 22 0686 to 22 0685A
MH: 22 0686MH: 22 0685Adownstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06860 ft. MGO - General Observation - COCKROACHES AT MH0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"12.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"12.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start63.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"68.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish68.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"68.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish69.9 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK69.9 ft. MGO - General Observation - COCKROACHES AT MH69.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0685A

Observation photos (4)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    12.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES AT MH

    69.9 ft. - General Observation - COCKROACHES AT MH

Observations (15)

DistanceCodeObservation
2SAP
68.6DAGS
63.3TFC
69.9MGOCONNECTION AT MH 3 O'CLOCK
68.6TFA
0MWM
68.6SAP
0AMH22 0686
12.9TFA
0MGOCOCKROACHES AT MH
69.9MGOCOCKROACHES AT MH
8TF
69.9AMH22 0685A
0MWL
12.9DAGS

Properties (7)

additional_info
630063050522203
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-05-06T01:18:46-07:00
documentation
PRO PIPE
is_lateral_inspection
false