Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 09:05 AM
  • 22 0670A_22 0670_05062022_031716.mp4

Date
05/06/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17020
Time
2:05 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10050
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0670A
Downstream MH
22 0670
Dir. of Survey
Downstream
Length Surveyed
205.8 ft.
Total Length
205.8 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
2G00
O&M Rating
80
Overall Index
2
Overall Quick
Overall Rating
280
Pipe schematic from manhole 22 0670A to 22 0670
MH: 22 0670AMH: 22 0670downstream0 ft. MGO - General Observation - COCKROACHES AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 0670A0 ft. MGO - General Observation - CONNECTION AT MH 4 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"34 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"100.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"104.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish203.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish203.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205.8 ft. MGO - General Observation - COCKROACHES AT MH205.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0670

Observation photos (3)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
34TFC
180.6TFC
0MGOCOCKROACHES AT MH
203.6SAP
0AMH22 0670A
205.8MGOCOCKROACHES AT MH
28.8TFC
0MGOCONNECTION AT MH 4 O'CLOCK
203.6DAGS
100.3TFC
203.6SSS
0MWL
0MWM
2DAGS
205.8AMH22 0670
104.9TFC
175.6TFC
2SAP
2SSS

Properties (7)

additional_info
630063050522203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-06T02:05:48-07:00
documentation
PRO PIPE
is_lateral_inspection
false