Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 09:33 AM
  • 22 0665_22 0664_05062022_034922.mp4

Date
05/06/2022
W/O
951828
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17014
Time
2:33 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10050
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0664
Downstream MH
22 0665
Dir. of Survey
Upstream
Length Surveyed
299.6 ft.
Total Length
299.6 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
295
O&M Index
2
O&M Quick
2K00
O&M Rating
118
Overall Index
2
Overall Quick
Overall Rating
413
Pipe schematic from manhole 22 0664 to 22 0665
MH: 22 0664MH: 22 0665upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 06650 ft. MGO - General Observation - COCKROACHES AT MH1.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish22.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"88.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"92.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"193.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"239.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"297.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start297.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start297.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start299.6 ft. MGO - General Observation - COCKROACHES AT MH299.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0664299.6 ft. MWL - Water Level, 10 %of cross sectional area299.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK299.6 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (5)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES AT MH

    299.6 ft. - General Observation - COCKROACHES AT MH

Observations (20)

DistanceCodeObservation
2SAP
0MGOCOCKROACHES AT MH
297.8SAP
299.6AMH22 0665
297.8DAGS
2SSS
0AMH22 0664
271.7TFC
106TFC
206.9TFC
299.6MGOCOCKROACHES AT MH
60.2TFA
297.8SSS
0MWL
110.1TFC
2DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
211.5TFA
277.2TFC

Properties (7)

additional_info
630063050522203
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-05-06T02:33:06-07:00
documentation
PRO PIPE
is_lateral_inspection
false