Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2022, 05:18 AM
  • 22 0645_22 0644_04212022_233306.mp4

Date
04/21/2022
W/O
951828
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00827
PipeID
P16993
Time
10:18 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10078
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_951828_TV22166_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0645
Downstream MH
22 0644
Dir. of Survey
Downstream
Length Surveyed
338.8 ft.
Total Length
338.8 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 22 0645 to 22 0644
MH: 22 0645MH: 22 0644downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06452 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZC - Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - Mag Coat5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK38.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"42.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"79.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"116.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"173.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"178.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"301 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"305.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"335.1 ft. SZC - Surface Other Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - Mag Coat335.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish335.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0644

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWM
335.7SSS
5MGOCONNECTION AT MH 3 O'CLOCK
338.8AMH22 0644
335.7SAV
335.1SZCMag Coat
173.6TFC
2SAV
0MWL
38.7TFC
79.8TFC
252.4TFC
2SSS
305.5TFC
116.4TFC
178.1TFC
2SZCMag Coat
0AMH22 0645
301TFC
42.9TFC

Properties (7)

additional_info
630098042122201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-04-21T22:18:26-07:00
documentation
PROPIPE
is_lateral_inspection
false