Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2022, 08:02 AM
  • 18 0278_18 0277_05102022_021303.mp4

Date
05/10/2022
W/O
952141
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00702
PipeID
P14106
Time
1:02 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10093
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_952141_TV18148_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0278
Downstream MH
18 0277
Dir. of Survey
Downstream
Length Surveyed
200.1 ft.
Total Length
200.1 ft.
Structural Index
3
Structural Quick
3G00
Structural Rating
117
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
117
Pipe schematic from manhole 18 0278 to 18 0277
MH: 18 0278MH: 18 0277downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 02780 ft. MWM - Water Mark, 20 %of cross sectional area0.1 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"24 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"72.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"75.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"175 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"197 ft. MGO - General Observation - POSSIBLE MAGNESIUM HYDROXIDE COATING THROUGHOUT THE REACH, 9 TO 3 OCLOCK197.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish200.1 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK200.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0277

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
72.5TFC
0MWL
2.5SAV
75.6TFC
175TFC
120.6TFC
24TFC
172.2TFC
21TFC
200.1MGOCONNECTION AT THE MH 3 OC'LOCK
124.3TFC
0AMH18 0278
197.6SAV
0.1MGOCONNECTION AT THE MH 9 OC'LOCK
200.1AMH18 0277
197MGOPOSSIBLE MAGNESIUM HYDROXIDE COATING THROUGHOUT THE REACH, 9 TO 3 OCLOCK
0MWM

Properties (7)

additional_info
630074050922201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-05-10T01:02:40-07:00
documentation
PROPIPE
is_lateral_inspection
false