Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2022, 09:11 AM
  • 18 0430_18 0429_05122022_032028.mp4

Date
05/12/2022
W/O
951858
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00675
PipeID
P14278
Time
2:11 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10096
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_951858_TV18097_MAY2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
18 0430
Downstream MH
18 0429
Dir. of Survey
Downstream
Length Surveyed
269.4 ft.
Total Length
269.4 ft.
Structural Index
4
Structural Quick
5I3J
Structural Rating
419
O&M Index
2
O&M Quick
2800
O&M Rating
16
Overall Index
4
Overall Quick
Overall Rating
435
Pipe schematic from manhole 18 0430 to 18 0429
MH: 18 0430MH: 18 0429downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 04300 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area4.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start30.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"81.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"231.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - SLUDGE243.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish269.4 ft. MSA - Survey Abandoned - CAM BLKD BY SLUDGE269.4 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish269.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    10.5 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE

    231.7 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start - SLUDGE

Observations (14)

DistanceCodeObservation
156.2TFC
269.4DSZ
269.4MSACAM BLKD BY SLUDGE
0AMH18 0430
10.5SRV
4.8SAP
0MWM
81.9TFC
30.9TFC
269.4SRV
269.4SAP
0MWL
231.7DSZSLUDGE
243.2TFC

Properties (7)

additional_info
630074051122201
custom_field_three
AGGRAGATE PROJECTING/REINFORCMENT VISIBLE
custom_field_two
2
customer
1
datetime
2022-05-12T02:11:54-07:00
documentation
PROPIPE
is_lateral_inspection
false