Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2022, 07:45 AM
  • 18 0437_18 0436_05172022_015935.mp4

Date
05/17/2022
W/O
951858
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00675
PipeID
P14287
Time
12:45 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10098
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_951858_TV18097_MAY2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0437
Downstream MH
18 0436
Dir. of Survey
Downstream
Length Surveyed
400.9 ft.
Total Length
400.9 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
237
Pipe schematic from manhole 18 0437 to 18 0436
MH: 18 0437MH: 18 0436downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 04370 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK2.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"23.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"51.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"75.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"124.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"152.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"176.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"228.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"276.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 6"352.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"372.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"399.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish400.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0436

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
400.9AMH18 0436
399.5SAV
0AMH18 0437
276.6TFC
372.9TFC
176.6TFC
352.7TFC
324.6TF
51.7TFC
252.2TFC
2.8SAV
99.7TFC
0MWM
152.5TFC
228.5TFC
200.3TFC
124.5TFC
75.9TFC
23.8TFC
0MWL
7.9TFC
300.6TF
0MGOCONNECTION AT THE MH 9 OC'LOCK

Properties (7)

additional_info
630074051622202
custom_field_three
AGGREGATE VISIBLE
custom_field_two
3
customer
1
datetime
2022-05-17T00:45:44-07:00
documentation
PROPIPE
is_lateral_inspection
false