Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2022, 10:19 AM
  • 02 1759A_02 1759_03112022_033130.mp4

Date
03/11/2022
W/O
941845
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00254
PipeID
P04106
Time
2:19 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9957
Sewer Name
02 DOWNEY-BELLFLOWER EXTENSION TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Routine Assessment
Project
WO_941845_TV02102_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
15 in.
Upstream MH
02 1759A
Downstream MH
02 1759
Dir. of Survey
Downstream
Length Surveyed
202.4 ft.
Total Length
202.4 ft.
Structural Index
2
Structural Quick
3G2G
Structural Rating
197
O&M Index
2
O&M Quick
2G00
O&M Rating
80
Overall Index
2
Overall Quick
Overall Rating
277
Pipe schematic from manhole 02 1759A to 02 1759
MH: 02 1759AMH: 02 1759downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 1759A0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8" - OPEN7.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start85.4 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"129.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"200 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish202 ft. MGO - General Observation - ROACHES @ MH202.4 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/UNKNOWN202.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish202.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN202.4 ft. AMH - Downstream Manhole, Survey Ends - 02 1759202.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

    85.4 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 6"

Observations (17)

DistanceCodeObservation
202.4MGOCONN @ MH 3 O'CLOCK/UNKNOWN
85.4TBA
0MWM
202.4DAGS
7.8CM
0AMH02 1759A
202MGOROACHES @ MH
2SSS
202.4MGOCONN @ MH 9 O'CLOCK/UNKNOWN
202.4AMH02 1759
200SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
2.5DAGS
129.1TFA
0MWL
202.4CM
6.6TFOPEN

Properties (7)

additional_info
630098031022204
custom_field_three
SPALLING/CRACKS
custom_field_two
3
customer
1
datetime
2022-03-11T02:19:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false