Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 23, 2022, 10:37 AM
  • A 0215_A 0214_02232022_025534.mp4

Date
02/23/2022
W/O
936486
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00323
PipeID
P08151
Time
2:37 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9744
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
26
Purpose
Routine Assessment
Project
RFIR_WO_936486_TV02346_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
75 in.
Width
39 in.
Upstream MH
A 0215
Downstream MH
A 0214
Dir. of Survey
Downstream
Length Surveyed
129 ft.
Total Length
129 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
125
O&M Index
4
O&M Quick
4D00
O&M Rating
92
Overall Index
3
Overall Quick
Overall Rating
217
Pipe schematic from manhole A 0215 to A 0214
MH: A 0215MH: A 0214downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 02150 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING17.3 ft. LR - Alignment Right, 40 %, Start62.9 ft. LL - Alignment Left, 40 %, Start62.9 ft. LR - Alignment Right, 40 %, Finish129 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish129 ft. LL - Alignment Left, 40 %, Finish129 ft. AMH - Downstream Manhole, Survey Ends - A 0214

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Alignment Right, 40 %, Start

    17.3 ft. - Alignment Right, 40 %, Start

  • Alignment Left, 40 %, Start

    62.9 ft. - Alignment Left, 40 %, Start

Observations (13)

DistanceCodeObservation
2SAP
2SSS
129SSS
0MWM
0AMHA 0215
17.3LR
62.9LL
129SAP
129LL
62.9LR
2MGOMAG COATING
0MWL
129AMHA 0214

Properties (8)

additional_info
630098022222201
custom_field_three
SPALLING, AGGREGATE VISBLE
custom_field_two
3
customer
1
datetime
2022-02-23T02:37:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
28636