Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 23, 2022, 07:05 AM
  • A 0170_A 0169_02222022_233424.mp4

Date
02/22/2022
W/O
936486
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00323
PipeID
P08107
Time
11:05 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9744
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
33
Purpose
Routine Assessment
Project
RFIR_WO_936486_TV02346_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Width
45 in.
Upstream MH
A 0170
Downstream MH
A 0169
Dir. of Survey
Downstream
Length Surveyed
844.4 ft.
Total Length
844.4 ft.
Structural Index
3
Structural Quick
3a2a
Structural Rating
840
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
840
Pipe schematic from manhole A 0170 to A 0169
MH: A 0170MH: A 0169downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 01700 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK2 ft. MGO - General Observation - MAG COATING2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start844.4 ft. AMH - Downstream Manhole, Survey Ends - A 0169844.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish844.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • General Observation - MAG COATING

    2 ft. - General Observation - MAG COATING

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2MGOMAG COATING
0AMHA 0170
844.4AMHA 0169
844.4SSS
844.4SAV
2SAV
0MWL
0MWM
2SSS
0MGOCONNECTION AT MH 6 O'CLOCK

Properties (8)

additional_info
630098022222201
custom_field_three
SPALLING, AGGREGATE VISBLE
custom_field_two
2
customer
1
datetime
2022-02-22T23:05:57-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
28048