Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2022, 07:19 AM
  • 15 0062_15 0061_05192022_015245.mp4

Date
05/19/2022
W/O
951556
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00622
PipeID
P11956
Time
12:19 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10118
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_951556_TV15220_MAY2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0062
Downstream MH
15 0061
Dir. of Survey
Downstream
Length Surveyed
415.1 ft.
Total Length
415.1 ft.
Structural Index
3
Structural Quick
5141
Structural Rating
80
O&M Index
2
O&M Quick
422`
O&M Rating
336
Overall Index
2
Overall Quick
Overall Rating
416
Pipe schematic from manhole 15 0062 to 15 0061
MH: 15 0062MH: 15 0061downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 00620 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. MGO - General Observation - COCKROACHES AT MH0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Start24.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"25.3 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES50.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"74.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"124.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"151.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"175.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"224.1 ft. CS - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES228.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES252.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"279 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"297.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"299.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"303.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start333.1 ft. MWM - Water Mark, 40 %of cross sectional area367.3 ft. MWM - Water Mark, 70 %of cross sectional area367.3 ft. MWL - Water Level, 50 %of cross sectional area383.4 ft. H - Hole, from 10 to 01 o'clock, within 8 inches of joint: YES412.6 ft. MWL - Water Level, 25 %of cross sectional area412.6 ft. MWM - Water Mark, 50 %of cross sectional area413.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES, Finish413.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish413.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 07 to 09 o'clock, , within 8 inches of joint: YES, Finish415.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK415.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0061415.1 ft. MGO - General Observation - COCKROACHES AT MH

Observation photos (8)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    25.3 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

    224.1 ft. - Crack Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    238.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    303.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Hole, from 10 to 01 o'clock, within 8 inches of joint: YES

    383.4 ft. - Hole, from 10 to 01 o'clock, within 8 inches of joint: YES

  • General Observation - COCKROACHES AT MH

    415.1 ft. - General Observation - COCKROACHES AT MH

Observations (36)

DistanceCodeObservation
50.9TFC
0MWL
303.9CM
2DAGS
0AMH15 0062
413.1DAGS
101.2TFC
2DAGS
175.1TFC
279TF
413.1CM
224.1CS
202.1TFC
238.9CM
25.3FM
415.1MGOCONNECTION AT MH 9 O'CLOCK
412.6MWL
299.7TFC
24.2TFC
367.3MWM
415.1AMH15 0061
0MGOCONNECTION AT MH 6 O'CLOCK
333.1MWM
297.2TB
0MGOCOCKROACHES AT MH
415.1MGOCOCKROACHES AT MH
412.6MWM
413.1DAGS
151.6TF
383.4H
74.8TFC
228.6TFC
252.4TFC
0MWM
124.8TFC
367.3MWL

Properties (7)

additional_info
630063051822202
custom_field_three
HOLE/FRACTURES/CRACKS
custom_field_two
2
customer
1
datetime
2022-05-19T00:19:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false