Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2022, 06:37 AM
  • 05 1006_05 1005_05242022_005106.mp4

Date
05/23/2022
W/O
951970
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00421
PipeID
P06238
Time
11:37 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10124
Sewer Name
05 AVIATION BOULEVARD TRUNK
City
EL SEGUNDO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_951970_TV05252_MAY2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
10 in.
Upstream MH
05 1006
Downstream MH
05 1005
Dir. of Survey
Downstream
Length Surveyed
333.7 ft.
Total Length
333.7 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 05 1006 to 05 1005
MH: 05 1006MH: 05 1005downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 10060 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2.6 ft. MWM - Water Mark, 10 %of cross sectional area51 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"61.5 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES133.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"210.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"282 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"331.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish331.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.7 ft. AMH - Downstream Manhole, Survey Ends - 05 1005333.7 ft. MGO - General Observation - COCKROACHES IN MH333.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (5)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    51 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    61.5 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Observation - COCKROACHES IN MH

    333.7 ft. - General Observation - COCKROACHES IN MH

Observations (17)

DistanceCodeObservation
333.7AMH05 1005
0AMH05 1006
331.9DAGS
51CM
0MWL
282TFC
2.6DAGS
0MGOCOCKROACHES IN MH
333.7MGOCOCKROACHES IN MH
0MGOCONNECTION AT MH 9 O'CLOCK
331.9CM
210.1TBA
57.7TFC
333.7MGOCONNECTION AT MH 9 O'CLOCK
133.2TFC
61.5FM
2.6MWM

Properties (7)

additional_info
630074052322202
custom_field_three
FRACTURES/CRACKS
custom_field_two
2
customer
1
datetime
2022-05-23T23:37:51-07:00
documentation
PRO PIPE
is_lateral_inspection
false