Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2022, 11:38 AM
  • 02 1762_02 1761_03082022_045251.mp4

Date
03/08/2022
W/O
941845
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00254
PipeID
P04109
Time
3:38 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9952
Sewer Name
02 DOWNEY-BELLFLOWER EXTENSION TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
15
Purpose
Routine Assessment
Project
WO_941845_TV02102_MAR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
15 in.
Upstream MH
02 1762
Downstream MH
02 1761
Dir. of Survey
Downstream
Length Surveyed
260.9 ft.
Total Length
260.9 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
312I
O&M Rating
105
Overall Index
2
Overall Quick
Overall Rating
360
Pipe schematic from manhole 02 1762 to 02 1761
MH: 02 1762MH: 02 1761downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 17622 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"73.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"144.7 ft. RMC - Roots Medium Connection, at 01 o'clock, 5 %, within 8 inches of joint: YES145.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN195.2 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8" - OPEN244.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4", 8"258 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish258 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish260 ft. MGO - General Observation - ROACHES @ MH260.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED260.9 ft. AMH - Downstream Manhole, Survey Ends - 02 1761

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Connection, at 01 o'clock, 5 %, within 8 inches of joint: YES

    144.7 ft. - Roots Medium Connection, at 01 o'clock, 5 %, within 8 inches of joint: YES

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

    145.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN

Observations (18)

DistanceCodeObservation
0MWM
258SSS
260.9CM
244.9TFA
260.9MGOCONN @ MH 3 O'CLOCK/CAPPED
144.7RMC
145.4TBOPEN
4.6CM
260MGOROACHES @ MH
2SSS
13.7TFA
260.9AMH02 1761
195.2TFOPEN
2DAGS
0MWL
73.9TFA
258DAGS
0AMH02 1762

Properties (7)

additional_info
63009803722202
custom_field_three
CRACKS
custom_field_two
3
customer
1
datetime
2022-03-08T03:38:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false