Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2022, 06:40 AM
  • C 0373_C 0372_03312022_234911.mp4

Date
03/31/2022
W/O
947052
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00141
PipeID
P09836
Time
11:40 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9948
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_947052_TV19012_APR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
78 in.
Upstream MH
C 0373
Downstream MH
C 0372
Dir. of Survey
Downstream
Length Surveyed
96.3 ft.
Total Length
96.3 ft.
Structural Index
2
Structural Quick
3B2C
Structural Rating
87
O&M Index
2
O&M Quick
2C00
O&M Rating
36
Overall Index
2
Overall Quick
Overall Rating
123
Pipe schematic from manhole C 0373 to C 0372
MH: C 0373MH: C 0372downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03730 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/STOP LOG DOWN0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 45% MAG COAT17.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish92.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish94 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish94 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish96.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE96.3 ft. AMH - Downstream Manhole, Survey Ends - C 0372

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
2DAGS
2SAP
92.8SAP
0AMHC 0373
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
96.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SSS
94DAGS
94SSS
96.3AMHC 0372
17.2SAV
0MGOCONN @ MH 3 O'CLOCK/STOP LOG DOWN
2MGO45% MAG COAT
0MWL
0MWM

Properties (8)

additional_info
630098033122201
custom_field_three
AGGREGATE PROECTING/INFILTRATION
custom_field_two
2
customer
1
datetime
2022-03-31T23:40:39-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
26760