Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2022, 08:05 AM
  • 02 0376_02 0375_05032022_021849.mp4

Date
05/03/2022
W/O
951851
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00250
PipeID
P02691
Time
1:05 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10044
Sewer Name
02 DOWNEY AVENUE EXTENSION TRUNK
City
PARAMOUNT
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_951851_TV02126_MAY2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0376
Downstream MH
02 0375
Dir. of Survey
Downstream
Length Surveyed
330.6 ft.
Total Length
330.6 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole 02 0376 to 02 0375
MH: 02 0376MH: 02 0375downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 03762 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start32.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"76.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"108.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"160.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"220 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"328 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish328.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish328.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.6 ft. MGO - General Observation - CONN @ MH 3 OCLOCK/OPEN330.6 ft. AMH - Downstream Manhole, Survey Ends - 02 0375

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
160.1TFC
328.6DAGS
32.9TFA
328.6CM
0MWL
330.6MGOCONN @ MH 3 OCLOCK/OPEN
2DAGS
328SSS
2SSS
3.3CM
108.6TFC
271.1TFC
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWM
76.1TFC
0AMH02 0376
220TFC
330.6AMH02 0375

Properties (7)

additional_info
630063050222201
custom_field_three
CRACKS
custom_field_two
2
customer
1
datetime
2022-05-03T01:05:04-07:00
documentation
PRO PIPE
is_lateral_inspection
false