Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 6, 2022, 06:16 AM
  • 22 0675_22 0674A_05062022_002919.mp4

Date
05/05/2022
W/O
951982
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P27148
Time
11:16 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10049
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
District
District 22
Page No.
23
Purpose
Routine Assessment
Sewer Type
Gravity
Material
NRCP
Shape
Other
Height
15 in.
Upstream MH
22 0675
Downstream MH
22 0674A
Dir. of Survey
Downstream
Length Surveyed
191.1 ft.
Total Length
191.1 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
247
Pipe schematic from manhole 22 0675 to 22 0674A
MH: 22 0675MH: 22 0674Adownstream0 ft. MGO - General Observation - COCKROACHES AT MH0 ft. AMH - Upstream Manhole, Survey Begins - 22 06750 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start22.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"36.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS103.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"174.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"179.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish189.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish189.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish191.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0674A

Observation photos (3)

  • General Observation - COCKROACHES AT MH

    0 ft. - General Observation - COCKROACHES AT MH

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
36.7DSZDEBRIS
189.4SAP
174.6TFC
103.7TFC
27.6TFC
0MGOCOCKROACHES AT MH
22.9TFC
191.1AMH22 0674A
0AMH22 0675
189.4DSZ
0MWL
2SAP
2SSS
0MWM
108.4TFC
179.9TFC
189.4SSS

Properties (7)

additional_info
630063050522202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-05-05T23:16:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false