Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2022, 05:40 AM
  • 14 0068_14 0067_04072022_225945.mp4

Date
04/07/2022
W/O
946842
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00577
PipeID
P18080
Time
10:40 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10033
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_946842_TV14039_APR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
14 0068
Downstream MH
14 0067
Dir. of Survey
Downstream
Length Surveyed
447.5 ft.
Total Length
447.5 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
3
O&M Quick
4123
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 14 0068 to 14 0067
MH: 14 0068MH: 14 0067downstream0 ft. MWL - Water Level, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00680 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start21.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start39.2 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"105.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"130 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"173.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"240.3 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"286.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"359.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"433.6 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1"445.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish445.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish445.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish447.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0067

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    21.8 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
433.6TBI
21.8SRV
105.9TBA
173.7TBA
240.3TBI
0MWL
445.1SAP
447.5AMH14 0067
39.2TBI
0AMH14 0068
445.1SRV
2SSS
2SAP
0MWM
130TFC
286.9TBA
359.3TFC
445.1SSS

Properties (7)

additional_info
630138040722201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-04-07T22:40:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false