Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 4, 2022, 07:36 AM
  • 18 0970_18 0969_542022_005318.mp4

Date
05/04/2022
W/O
0947144
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00716
PipeID
P14820
Time
12:36 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3080R
Sewer Name
18 WORSHAM CREEK TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
11
Purpose
Maintenance Related
Project
20220504MDM_WORSHAM_CREEK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
7.5 in.
Upstream MH
18 0970
Downstream MH
18 0969
Dir. of Survey
Downstream
Length Surveyed
327.2 ft.
Total Length
327.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0970 to 18 0969
MH: 18 0970MH: 18 0969downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWM - Water Mark, 20 %of cross sectional area63.1 ft. RMC - Roots Medium Connection, from 01 to 06 o'clock, 40 %, within 8 inches of joint: NO327.2 ft. AMH - Downstream Manhole, Survey Ends - 1:25AM

Observation photos (1)

  • Roots Medium Connection, from 01 to 06 o'clock, 40 %, within 8 inches of joint: NO

    63.1 ft. - Roots Medium Connection, from 01 to 06 o'clock, 40 %, within 8 inches of joint: NO

Observations (6)

DistanceCodeObservation
0MWL
63.1RMC
0MGOConn. @ Mh, 9 O' Clock. Active
0AMH12:45AM
0MWM
327.2AMH1:25AM

Properties (7)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2022-05-04T00:36:23-07:00
documentation
MARTIN,OLIVER 111,IGNACIO
is_lateral_inspection
false
lining
PVCP-Folded/Reformed
year_laid
20000114