Wastewater/Activity/PacpInspection/1.0Apr 13, 2022, 05:00 AM
  • 22 0502_22 0501_04122022_222523.mp4

Date
04/12/2022
W/O
946708
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00800
PipeID
P16841
Time
10:00 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9962
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_946708_TV22031_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0501
Downstream MH
22 0502
Dir. of Survey
Upstream
Length Surveyed
330.7 ft.
Total Length
330.7 ft.
Structural Index
4
Structural Quick
4331
Structural Rating
15
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
15
Pipe schematic from manhole 22 0501 to 22 0502
MH: 22 0501MH: 22 0502upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 05020 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish13.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"16.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"61.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"64.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"64.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"82.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"111.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish112.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"115.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"163.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"166.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"174.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start208 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"210.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"234 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES254.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES258.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"261.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"312.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"315.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"323.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start328.7 ft. MGO - General Observation - MAG COAT330.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK330.7 ft. MWM - Water Mark, 15 %of cross sectional area330.7 ft. MWL - Water Level, 10 %of cross sectional area330.7 ft. AMH - Downstream Manhole, Survey Begins - 22 0501

Observation photos (5)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    75.8 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    96.7 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    156.5 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (29)

DistanceCodeObservation
122.7TFC
0MGOCONNECTION AT MH 9 O'CLOCK
0MWM
2MGOMAG COAT
71.9TFC
219.5FM
218.3TFC
317.2TFC
266.3TF
330.7AMH22 0502
14.8TFC
7.1SAP
75.8FM
314.1TFC
266.3TFC
248.1TF
96.7FM
215.5TFC
17.8TFC
167.4TFC
156.5FM
0MWL
0AMH22 0501
120TFC
68.9TFC
328.7SAP
269.1TFC
164.5TFC
330.7MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630138041222201
custom_field_three
AGREGATE PROJECTING, FRACTURES
custom_field_two
2
customer
1
datetime
2022-04-12T22:00:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false