Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2022, 08:26 AM
  • 22 0495_22 0494_04132022_013714.mp4

Date
04/13/2022
W/O
946708
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00800
PipeID
P16834
Time
1:26 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9962
Sewer Name
22 COVINA CONNECTION EXTENSION TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_946708_TV22031_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
22 0494
Downstream MH
22 0495
Dir. of Survey
Upstream
Length Surveyed
166.3 ft.
Total Length
166.3 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 22 0494 to 22 0495
MH: 22 0494MH: 22 0495upstream0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 22 049525.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"28.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"72.6 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES76.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"79.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"105.5 ft. FL - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES127.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"130.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"163.7 ft. MGO - General Observation - MAG COAT163.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start166.3 ft. MWL - Water Level, 10 %of cross sectional area166.3 ft. MWM - Water Mark, 15 %of cross sectional area166.3 ft. AMH - Downstream Manhole, Survey Begins - 22 0494166.3 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    60.8 ft. - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    93.7 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
89.7TFC
0MWL
140.9TFC
166.3SAP
166.3AMH22 0495
138TFC
0MWM
35.9TFC
60.8FL
2.6MGOMAG COAT
93.7FL
86.7TFC
0AMH22 0494
0MGOCONNECTION AT MH 9 O'CLOCK
38.8TFC
2.6SAP

Properties (7)

additional_info
630138041222201
custom_field_three
AGREGATE PROJECTING, FRACTURES
custom_field_two
3
customer
1
datetime
2022-04-13T01:26:52-07:00
documentation
PRO PIPE
is_lateral_inspection
false