Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 18, 2022, 08:33 AM
  • 15 1089_15 1088_04182022_014048.mp4

Date
04/18/2022
W/O
947050
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00614
PipeID
P12849
Time
1:33 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10072
Sewer Name
15 MERCED TRUNK, SECTION 1
City
S EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
RFIR_WO_947050_TV15099_APR2022
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 1089
Downstream MH
15 1088
Dir. of Survey
Downstream
Length Surveyed
171.2 ft.
Total Length
171.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 15 1089 to 15 1088
MH: 15 1089MH: 15 1088downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 10890 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area13.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES38.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"77.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"148.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"171.2 ft. AMH - Downstream Manhole, Survey Ends - 15 1088

Observation photos (1)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    13.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (9)

DistanceCodeObservation
38.6TFC
0MGOCONNECTION AT THE MH 3 OC'LOCK
171.2AMH15 1088
148.3TF
77.9TF
0AMH15 1089
0MWM
0MWL
13.5CM

Properties (7)

additional_info
630074041822001
custom_field_three
CRACK
custom_field_two
3
customer
1
datetime
2022-04-18T01:33:16-07:00
documentation
PRO PIPE
is_lateral_inspection
false