Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 8, 2022, 07:07 AM
  • 01 1176_01 1175_04082022_003201.mp4

Date
04/08/2022
W/O
946843
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00225
PipeID
P02028
Time
12:07 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9794
Sewer Name
01 WILCOX AVENUE TRUNK
City
BELL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
WO_946843_TV01072_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
24 in.
Upstream MH
01 1176
Downstream MH
01 1175
Dir. of Survey
Downstream
Length Surveyed
375.1 ft.
Total Length
375.1 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
231
O&M Index
2
O&M Quick
412N
O&M Rating
152
Overall Index
3
Overall Quick
Overall Rating
383
Pipe schematic from manhole 01 1176 to 01 1175
MH: 01 1176MH: 01 1175downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 11760 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.5 ft. MGO - General Observation - MAG COATING50.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"68.8 ft. TFB - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"70 ft. FS - Fracture Spiral, from 09 to 03 o'clock, within 8 inches of joint: YES101.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"107 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"147.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"183.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"201 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"223.1 ft. FS - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES224 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"249.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"296.8 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES298.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: NO, 4"338.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 4"372.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish372.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375.1 ft. AMH - Downstream Manhole, Survey Ends - 01 1175

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 09 to 03 o'clock, within 8 inches of joint: YES

    70 ft. - Fracture Spiral, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

    223.1 ft. - Fracture Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

    296.8 ft. - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
147.3TF
201TF
223.1FS
0MWL
0AMH01 1176
101.9TF
50.8TF
372.5DAGS
249.1TF
296.8FL
338.7TF
68.8TFB
8.5MGOMAG COATING
3SAP
183.1TF
375.1AMH01 1175
107TF
224TF
372.5SAP
70FS
0MWM
3DAGS
0MGOCONNECTION AT THE MH 3 OC'LOCK
298.3TF

Properties (7)

additional_info
630074040722201
custom_field_three
FRACTURES, AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2022-04-08T00:07:18-07:00
documentation
PROPIPE
is_lateral_inspection
false