01 1172_01 1171_04082022_032742.mp4
4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
5.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
20 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start
21.4 ft. - Broken, from 10 to 02 o'clock, within 8 inches of joint: NO
24.3 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: NO
26.7 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | CONNECTION AT THE MH 9 OC'LOCK |
| 38.9 | SAP | — |
| 26.7 | FM | — |
| 40.6 | MGO | CONNECTION AT THE MH 9 OC'LOCK |
| 40.6 | AMH | 01 1171 |
| 0 | AMH | 01 1172 |
| 0 | MWL | — |
| 21.4 | B | — |
| 20 | SSS | — |
| 0 | MGO | CONNECTION AT THE MH 3 OC'LOCK |
| 0 | MWM | — |
| 5.1 | SAP | — |
| 38.9 | SSS | — |
| 24.3 | FM | — |
| 38.9 | DAGS | — |
| 4 | DAGS | — |