Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 24, 2022, 06:28 AM
  • 15 0137_15 0136_03232022_234041.mp4

Date
03/23/2022
W/O
941456
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00634
PipeID
P12036
Time
11:28 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10017
Sewer Name
15 TYLER AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_941456_TV15037_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0136
Downstream MH
15 0137
Dir. of Survey
Upstream
Length Surveyed
345.2 ft.
Total Length
345.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 15 0136 to 15 0137
MH: 15 0136MH: 15 0137upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 01372.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish18.3 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"106.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"253.7 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"343.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start343.2 ft. MGO - General Observation - MAG COAT345.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK345.2 ft. MWM - Water Mark, 25 %of cross sectional area345.2 ft. MWL - Water Level, 5 %of cross sectional area345.2 ft. AMH - Downstream Manhole, Survey Begins - 15 0136

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

Observations (11)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
238.8TFA
326.9TBA
91.5TBA
345.2AMH15 0137
0MWM
2DAGS
0MWL
343.1DAGS
2MGOMAG COAT
0AMH15 0136

Properties (7)

additional_info
630138032322201
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2022-03-23T23:28:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false