Wastewater/Activity/PacpInspection/1.0Mar 23, 2022, 07:45 AM
  • 15 0130_15 0129_03232022_005849.mp4

Date
03/23/2022
W/O
941456
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00634
PipeID
P12029
Time
12:45 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10016
Sewer Name
15 TYLER AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_941456_TV15037_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0130
Downstream MH
15 0129
Dir. of Survey
Downstream
Length Surveyed
378.1 ft.
Total Length
378.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 15 0130 to 15 0129
MH: 15 0130MH: 15 0129downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 01300 ft. MGO - General Observation - CONNECTION AT MH 3, 9 O'CLOCK0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start81.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"178.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"221.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"227.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"328.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"350.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"376.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish376.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish378.1 ft. AMH - Downstream Manhole, Survey Ends - 15 0129

Observation photos (3)

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2MGOMAG COAT
81.4TFC
350.5TFC
376.4DAGS
378.1AMH15 0129
178.9TFC
227.8TFC
0MWL
328.9TFC
2DAGS
376.4SAP
2SAP
0AMH15 0130
0MGOCONNECTION AT MH 3, 9 O'CLOCK
221.4TFC
99.9TFC
0MWM

Properties (5)

additional_info
630138032222201
customer
1
datetime
2022-03-23T00:45:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false