Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2022, 07:59 AM
  • 15 0129_15 0128_03232022_011337.mp4

Date
03/23/2022
W/O
941456
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00634
PipeID
P12028
Time
12:59 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10016
Sewer Name
15 TYLER AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_941456_TV15037_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0129
Downstream MH
15 0128
Dir. of Survey
Downstream
Length Surveyed
385.4 ft.
Total Length
385.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 15 0129 to 15 0128
MH: 15 0129MH: 15 0128downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 01290 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT6.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start19.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"21.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"217.6 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"242 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"321.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"383.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish383.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish385.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK385.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0128385.4 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    385.4 ft. - General Observation - COCKROACHES IN MH

Observations (17)

DistanceCodeObservation
242TFA
383.5DAGS
2DAGS
21.7TFA
0AMH15 0129
0MWM
383.5SAP
0MWL
55.3TFC
19.3TFA
385.4MGOCONNECTION AT MH 3 O'CLOCK
6.7SAP
385.4AMH15 0128
385.4MGOCOCKROACHES IN MH
321.5TFA
2MGOMAG COAT
217.6TFA

Properties (5)

additional_info
630138032222201
customer
1
datetime
2022-03-23T00:59:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false