Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 23, 2022, 08:40 AM
  • 15 0128_15 0127_03232022_015212.mp4

Date
03/23/2022
W/O
941456
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00634
PipeID
P12027
Time
1:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10016
Sewer Name
15 TYLER AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
WO_941456_TV15037_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0127
Downstream MH
15 0128
Dir. of Survey
Upstream
Length Surveyed
189.8 ft.
Total Length
189.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 15 0127 to 15 0128
MH: 15 0127MH: 15 0128upstream0 ft. AMH - Upstream Manhole, Survey Ends - 15 01280 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish19.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"65 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"138.9 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, from 05 to 07 o'clock160 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"187.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start187.8 ft. MGO - General Observation - MAG COAT187.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start189.8 ft. MWM - Water Mark, 25 %of cross sectional area189.8 ft. MWL - Water Level, 10 %of cross sectional area189.8 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK189.8 ft. AMH - Downstream Manhole, Survey Begins - 15 0127

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    189.8 ft. - General Observation - COCKROACHES IN MH

Observations (17)

DistanceCodeObservation
187.9SAP
29.8TFA
189.8AMH15 0128
2DAGS
70.5TFA
189.8MGOCOCKROACHES IN MH
2MGOMAG COAT
189.8MGOCONNECTION AT MH 12 O'CLOCK
0MWM
0MWL
50.9OBR
0MGOCONNECTION AT MH 6 O'CLOCK
2SAP
0AMH15 0127
124.8TFA
170.3TFC
187.9DAGS

Properties (7)

additional_info
630138032222201
custom_field_three
PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2022-03-23T01:40:22-07:00
documentation
PRO PIPE
is_lateral_inspection
false