Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 30, 2022, 09:19 AM
  • 15 0347_15 0346_03302022_023609.mp4

Date
03/30/2022
W/O
946844
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00598
PipeID
P12273
Time
2:19 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10026
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_946844_TV15016_APR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
15 0347
Downstream MH
15 0346
Dir. of Survey
Downstream
Length Surveyed
401.4 ft.
Total Length
401.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 15 0347 to 15 0346
MH: 15 0347MH: 15 0346downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MH0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 03472 ft. MGO - General Observation - MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"33.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"123.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"127.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start193.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"216.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"225.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.6 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"274.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"278.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"286.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"288.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"330.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"372.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"376.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"399.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish399.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish399.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish401.4 ft. AMH - Downstream Manhole, Survey Ends - 15 0346401.4 ft. MGO - General Observation - COCKROACHES IN MH

Observation photos (6)

  • General Observation - COCKROACHES IN MH

    0 ft. - General Observation - COCKROACHES IN MH

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    190.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MH

    401.4 ft. - General Observation - COCKROACHES IN MH

Observations (34)

DistanceCodeObservation
0MWM
399.4SAP
225.2TFC
399.4DAGS
250.6TBA
193.7TBA
30TFC
401.4AMH15 0346
2MGOMAG COAT
0MGOCOCKROACHES IN MH
286.4TBA
180.6TFA
190.1SSS
274.4TFC
33.2TFA
327.6TFC
2DAGS
288.9TBA
123.4TFC
78.1TFC
401.4MGOCOCKROACHES IN MH
278.6TFC
376.4TFC
372.5TFA
127.8TFC
216.9TFC
330.9TFC
2SAP
0MGOCONNECTION AT MH 9 O'CLOCK
73.8TFC
0MWL
0AMH15 0347
399.4SSS
168TFC

Properties (7)

additional_info
630138032922202
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-03-30T02:19:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false