Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 31, 2022, 06:26 AM
  • G 0238_G 0237_03302022_233940.mp4

Date
03/30/2022
W/O
946836
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01247
PipeID
P01665
Time
11:26 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9946
Sewer Name
G JOINT OUTFALL G - UNIT 9 TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
21
Purpose
Routine Assessment
Project
WO_946836_TV01261_APR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
24 in.
Upstream MH
G 0238
Downstream MH
G 0237
Dir. of Survey
Downstream
Length Surveyed
272.7 ft.
Total Length
272.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole G 0238 to G 0237
MH: G 0238MH: G 0237downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - G 02382.1 ft. MGO - General Observation - PIPE IS LINED62.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"208.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"272.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK272.7 ft. AMH - Downstream Manhole, Survey Ends - G 0237272.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observations (10)

DistanceCodeObservation
272.7AMHG 0237
62.8TF
2.1MGOPIPE IS LINED
272.7MGOCONNECTION AT MH 9 O'CLOCK
0MWL
272.5MGOCONNECTION AT MH 3 O'CLOCK
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
208.3TF
0AMHG 0238

Properties (8)

additional_info
630098033022203
custom_field_three
NO SEVERE DEFECTS
custom_field_two
4
customer
1
datetime
2022-03-30T23:26:10-07:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP