20 0117_20 0116_04282022_014857.mp4
3.1 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
3.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
52.8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
242.8 ft. - Deposits Settled Other, 25 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO
256.1 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 3.1 | SSS | — |
| 99.1 | DAGS | — |
| 0 | AMH | 20 0117 |
| 378.9 | AMH | 20 0116 |
| 3.1 | SAP | — |
| 242.8 | DSZ | — |
| 49.7 | TFC | — |
| 251.9 | TFC | — |
| 357.6 | TFC | — |
| 242.8 | DSZ | — |
| 0 | MWM | — |
| 256.1 | TFC | — |
| 52.8 | DSZ | — |
| 376.4 | SSS | — |
| 376.4 | DSZ | — |
| 376.4 | SAP | — |
| 159 | TFC | — |
| 0 | MWL | — |
| 256.1 | DSZ | — |
| 154.9 | TFC | — |
| 353.6 | TFC | — |
| 58 | TFC | — |