Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 19, 2022, 10:44 AM
  • H 0967_H 0966_04192022_034922.mp4

Date
04/19/2022
W/O
946711
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01005
PipeID
P15380
Time
3:44 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K10043
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Routine Assessment
Project
RFIR_WO_946711_TV21097_APR2022
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
H 0967
Downstream MH
H 0966
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole H 0967 to H 0966
MH: H 0967MH: H 0966downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0967, WEST SIPHON0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MSA - Survey Abandoned - VIEW OF DOWNLEG OF U/S SIPHON.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

Observation photos (3)

  • Survey Abandoned - VIEW OF DOWNLEG OF U/S SIPHON.

    2 ft. - Survey Abandoned - VIEW OF DOWNLEG OF U/S SIPHON.

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (6)

DistanceCodeObservation
2MSAVIEW OF DOWNLEG OF U/S SIPHON.
0MWM
2SSS
0AMHH 0967, WEST SIPHON
0MWL
2SAP

Properties (7)

additional_info
630098041822204
custom_field_three
PROJECTING AGGREGATE/SPALLING
custom_field_two
2
customer
1
datetime
2022-04-19T03:44:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false