Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 13, 2022, 08:32 AM
  • B 0625_B 0624_4132022_014235.mp4

Date
04/13/2022
W/O
0941294
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00107
PipeID
P09290
Time
1:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H3063
Sewer Name
B JOINT OUTFALL B - UNIT 8D
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Capital Improvement Program Assesment
Project
20220413MDM_JOINT_OUTFALL_B_UNIT_8D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
B 0625
Downstream MH
B 0624
Dir. of Survey
Downstream
Length Surveyed
129.7 ft.
Total Length
129.7 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole B 0625 to B 0624
MH: B 0625MH: B 0624downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. STUB0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 1:40AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 98%15.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SWOLLEN PEELING CONCRETE UNDER MAG COAT23.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE129 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT129 ft. MGO - General Observation - 98% MAG COAT129.7 ft. AMH - Downstream Manhole, Survey Ends - 1:55AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 98%

    2 ft. - General Observation - MAG COAT 98%

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SWOLLEN PEELING CONCRETE UNDER MAG COAT

    15.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - SWOLLEN PEELING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    23.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Downstream Manhole, Survey Ends - 1:55AM

    129.7 ft. - Downstream Manhole, Survey Ends - 1:55AM

Observations (10)

DistanceCodeObservation
0MGOConn. @ Mh, 3 O' Clock. STUB
23.9SSSPEELING CONCRETE
129SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
129MGO98% MAG COAT
15.6SSSSWOLLEN PEELING CONCRETE UNDER MAG COAT
0MGOConn. @ Mh, 9 O' Clock. Active
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
2MGOMAG COAT 98%
129.7AMH1:55AM
0AMH1:40AM

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE UNDER MAG COAT
custom_field_two
3
customer
LACSD
datetime
2022-04-13T01:32:28-07:00
documentation
MARTIN,IGNACIO
is_lateral_inspection
false