Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 11, 2022, 05:58 PM
  • A 0658_A 0657_02112022_101922.mp4

Date
02/11/2022
W/O
936573
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07867
Time
9:58 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9903
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
WO_936573_TV21027_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
A 0658
Downstream MH
A 0657
Dir. of Survey
Downstream
Length Surveyed
749.8 ft.
Total Length
749.8 ft.
Structural Index
3
Structural Quick
3]2]
Structural Rating
745
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
745
Pipe schematic from manhole A 0658 to A 0657
MH: A 0658MH: A 0657downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 06580 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.2 ft. MGO - General Observation - MAG COATING5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start293.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"748 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish748 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish749.8 ft. AMH - Downstream Manhole, Survey Ends - A 0657

Observations (10)

DistanceCodeObservation
5SAP
293.1TF
0AMHA 0658
2.2MGOMAG COATING
748SSS
0MWM
749.8AMHA 0657
748SAP
0MWL
5SSS

Properties (7)

additional_info
630098021122062
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
3
customer
1
datetime
2022-02-11T09:58:25-08:00
documentation
PROPIPE
is_lateral_inspection
false