Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 16, 2022, 05:35 PM
  • A 0604_A 0603_02162022_100948.mp4

Date
02/16/2022
W/O
936573
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07809
Time
9:35 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9905
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_936573_TV21027_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
15 in.
Upstream MH
A 0604
Downstream MH
A 0603
Dir. of Survey
Downstream
Length Surveyed
1003 ft.
Total Length
1003 ft.
Structural Index
3
Structural Quick
3g2g
Structural Rating
995
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
995
Pipe schematic from manhole A 0604 to A 0603
MH: A 0604MH: A 0603downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 06040 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2.1 ft. MGO - General Observation - MAG COATING5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start999 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish999 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1003 ft. AMH - Downstream Manhole, Survey Ends - A 0603

Observations (9)

DistanceCodeObservation
2.1MGOMAG COATING
0AMHA 0604
5SSS
5SAP
1003AMHA 0603
999SSS
0MWM
999SAP
0MWL

Properties (7)

additional_info
630098021622051
custom_field_three
SPALLING/AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2022-02-16T09:35:53-08:00
documentation
PROPIPE
is_lateral_inspection
false