Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 16, 2022, 02:37 PM
  • A 0619_A 0618_02162022_071428.mp4

Date
02/16/2022
W/O
936573
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00316
PipeID
P07824
Time
6:37 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9905
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_936573_TV21027_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
51 in.
Upstream MH
A 0619
Downstream MH
A 0618
Dir. of Survey
Downstream
Length Surveyed
1058.3 ft.
Total Length
1058.3 ft.
Structural Index
2
Structural Quick
5132
Structural Rating
429
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
429
Pipe schematic from manhole A 0619 to A 0618
MH: A 0619MH: A 0618downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06190 ft. MWM - Water Mark, 25 %of cross sectional area2.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"430.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"579.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"747.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"923.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"1019.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"1048.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start1050 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1054.7 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO1054.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1058.3 ft. AMH - Downstream Manhole, Survey Ends - A 0618

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    1048.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO

    1054.7 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO

Observations (18)

DistanceCodeObservation
1058.3AMHA 0618
1054.7SRV
2.2MGOCONNECTION AT MH 3 O'CLOCK
579.5TF
0MWL
0AMHA 0619
172.4TFC
1048.3SAP
47.5TFA
3SSS
1054.7SAP
747.6TF
1050SSS
430.6TF
1019.6TF
250.5TF
0MWM
923.5TF

Properties (7)

additional_info
630098021622051
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
3
customer
1
datetime
2022-02-16T06:37:09-08:00
documentation
PROPIPE
is_lateral_inspection
false