Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 18, 2022, 06:30 AM
  • A 0605_A 0604_02172022_230034.mp4

Date
02/17/2022
W/O
936573
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00316
PipeID
P07810
Time
10:30 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9785
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
38
Purpose
Routine Assessment
Project
WO_936573_TV21027_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
48 in.
Upstream MH
A 0605
Downstream MH
A 0604
Dir. of Survey
Downstream
Length Surveyed
495 ft.
Total Length
495 ft.
Structural Index
3
Structural Quick
3S2R
Structural Rating
489
O&M Index
2
O&M Quick
2P00
O&M Rating
166
Overall Index
2
Overall Quick
Overall Rating
655
Pipe schematic from manhole A 0605 to A 0604
MH: A 0605MH: A 0604downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 06050 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. MGO - General Observation - MAG COATING13.2 ft. LL - Alignment Left, 20 %, Start15 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish53.6 ft. LL - Alignment Left, 20 %, Finish116.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"211.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start321.5 ft. LR - Alignment Right, 15 %, Start410 ft. LR - Alignment Right, 15 %, Finish494 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish495 ft. AMH - Downstream Manhole, Survey Ends - A 0604495 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish495 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    211.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
495AMHA 0604
495SAP
2.7SAV
0AMHA 0605
2.7MGOMAG COATING
0MWL
13.2LL
410LR
495DAGS
15SSS
321.5LR
211.3DAGS
15.7SAP
53.6LL
116.6TB
15.7SAV
0MWM
494SSS

Properties (7)

additional_info
630098021722201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
3
customer
1
datetime
2022-02-17T22:30:30-08:00
documentation
PROPIPE
is_lateral_inspection
false