Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 16, 2022, 07:50 AM
  • A 0633_A 0632_02162022_000958.mp4

Date
02/15/2022
W/O
936573
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00316
PipeID
P07838
Time
11:50 PM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K9783
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Routine Assessment
Project
WO_936573_TV21027_FEB2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
42 in.
Upstream MH
A 0633
Downstream MH
A 0632
Dir. of Survey
Downstream
Length Surveyed
557.1 ft.
Total Length
557.1 ft.
Structural Index
2
Structural Quick
3P2U
Structural Rating
481
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
481
Pipe schematic from manhole A 0633 to A 0632
MH: A 0633MH: A 0632downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06330 ft. MWL - Water Level, 15 %of cross sectional area2.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COATING19 ft. MGO - General Observation - CONSTANT SPALSHING DUE TO FAST FLOW432.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish550 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish554.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO557.1 ft. AMH - Downstream Manhole, Survey Ends - A 0632

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO

    554.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO

Observations (11)

DistanceCodeObservation
2.5SAP
432.1SAP
19MGOCONSTANT SPALSHING DUE TO FAST FLOW
0MWM
0AMHA 0633
554.2SAP
550SSS
2.5SSS
557.1AMHA 0632
2.5MGOMAG COATING
0MWL

Properties (7)

additional_info
630098021522201
custom_field_three
AGGREGATRE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2022-02-15T23:50:10-08:00
documentation
PROPIPE
is_lateral_inspection
false