Wastewater/Activity/PacpInspection/1.0Feb 24, 2022, 09:40 AM
  • 01 0439_01 0438_02242022_025617.mp4

Date
02/24/2022
W/O
941896
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00208
PipeID
P00921
Time
1:40 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9882
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_941896_TV01030_MAR2022
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
18 in.
Upstream MH
01 0439
Downstream MH
01 0438
Dir. of Survey
Downstream
Length Surveyed
310.5 ft.
Total Length
310.5 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
427
Pipe schematic from manhole 01 0439 to 01 0438
MH: 01 0439MH: 01 0438downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 04390 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/CAPPED0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 30% MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start67 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN69.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"92.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"94.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6"117.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"120.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"126 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"146.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"159.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"171.7 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"195.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"198 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"205.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"220.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"226.3 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"243.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"249.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"271.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN294.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"300.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"304.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"308.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish308.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish308.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.5 ft. AMH - Downstream Manhole, Survey Ends - 01 0438310.5 ft. MGO - General Observation - ROACHES @ MH

Observation photos (5)

  • General Observation - ROACHES @ MH

    0 ft. - General Observation - ROACHES @ MH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MH

    310.5 ft. - General Observation - ROACHES @ MH

Observations (36)

DistanceCodeObservation
120.9TFC
94.8TFC
195.2TFC
0MWM
220.4TFC
2SSS
117.8TFC
205.1TFA
308.4SAP
2DAGS
126TFC
243.6TFC
0MWL
0AMH01 0439
300.5TFC
159.6TFC
198TFC
271.9TFOPEN
249.1TFC
294.8TFC
310.5AMH01 0438
310.5MGOROACHES @ MH
171.7TFA
67TFOPEN
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
226.3TBA
0MGOCONN @ MH 3 O'CLOCK/CAPPED
304.9TFC
308.4DAGS
2MGO30% MAG COAT
92.5TFC
69.2TFC
0MGOROACHES @ MH
308.4SSS
2SAP
146.4TFC

Properties (7)

additional_info
630138022322201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2022-02-24T01:40:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false