Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2022, 10:32 AM
  • C 0369_C 0368_04012022_034047.mp4

Date
04/01/2022
W/O
947165
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00141
PipeID
P09832
Time
3:32 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K9949
Sewer Name
C JOINT OUTFALL C - UNIT 8C
City
HAWIIAN GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_947165_TV19080_APR2022
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
78 in.
Upstream MH
C 0369
Downstream MH
C 0368
Dir. of Survey
Downstream
Length Surveyed
22.9 ft.
Total Length
22.9 ft.
Structural Index
4
Structural Quick
5434
Structural Rating
32
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
32
Pipe schematic from manhole C 0369 to C 0368
MH: C 0369MH: C 0368downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 03692.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COATING2.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start20.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish22.7 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish22.9 ft. AMH - Downstream Manhole, Survey Ends - C 0368 ZOOMED IN

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2.1SAP
22.7SRV
2.1MGOMAG COATING
0MGOCONNECTION AT MH 9 O'CLOCK
0MWL
2.1SRV
20.9SAP
0MWM
22.9AMHC 0368 ZOOMED IN
0AMHC 0369

Properties (8)

additional_info
63009033022202
custom_field_three
AGGREGATE PROJECTING/REINFORCEMENT VISIBLE
custom_field_two
2
customer
1
datetime
2022-04-01T03:32:56-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
26760